All Trenching and Boring were chosen as the preferred civil contractor to install an extensive array of conduits required for the exit feeders at the new Broadmeadows South (BMS) Zone Sub Station (ZSS). These conduits where required to take the new 22KV cable from the ZSS switch room to various locations to allow the substation to provide power to existing and new poles.
PROJECT DESCRIPTION
PROJECT DETAILS
Categories: | |
Client: | BMS new exit feeders |