Flemington Race Track Bore
Project Details - Mains Water Pipe Replacement - Flemington Race Course
Client:
Victorian Racing Club Limited. (VRC)
Project Description
Flemington Racecourse Water Main Replacement – ATB Services
As part of the essential services upgrade at Flemington Racecourse ,All Trenching and Boring Services was contracted to replace the existing mains water pipe at the track.
The project required ATB Services to bore beneath the iconic Flemington Racecourse turf utiliseing out state-of-the-art trenchless boring technology to complete a 120-metre bore under the race track, carefully avoiding any disruption to the turf and ensuring that the integrity of the surface was preserved for future events.
Once the bore was completed, a new 180mm water pipe was pulled through and prepared for connection.
Our extensive experience in large-scale infrastructure projects, especially in sensitive and high-traffic environments, made ATB Services the perfect choice for this job. By employing non-invasive trenchless boring techniques, we were able to complete the task with minimal disruption, maintaining the condition of the Flemington turf and ensuring the project was completed on time.